Our team started designing with cross-laminated timber when it was still a relatively new system in Cincinnati. Since then, we’ve used this structural design on a variety of buildings, each with unique requirements.
​
Our engineering firm isn’t unique in incorporating these efficient wood panels for building structure design.
​
There are more of those buildings every year.

According to WoodWorks, 2,598 multifamily, commercial, or institutional mass timber projects were in progress or built across the U.S. as of December 2025, and the total has been climbing by roughly 20 percent year over year.
​
Our team has used CLT as a roof structure, as an interior finish people experience every day, and as part of a hybrid system with SIPs on three of our recent projects.

Project 1: FotoFocus and CLT as a Flat Roof Structure

exterior of the FotoFocus building in Cincinnati, a two story mass timber commercial building with dark brick cladding and a glass curtain wall.

The front of The FotoFocus Center sits right on the property line facing the street. Behind it, the CLT floor and roof panels and glulam framing carry two stories of gallery space.

Our team provided structural engineering services for the FotoFocus Center in Over-the-Rhine, one of Cincinnati’s first major cross-laminated timber projects.

Designed and built by Jose Garcia Design + Construction, the center spans 14,700 square feet over two stories, with exhibition galleries on both floors, office space, a conference room, and secure art storage.

The structural system pairs glulam beams and columns with CLT floor and roof panels, all of which are left fully exposed throughout the interior. The structure and the finish are the same thing, and every panel and connection is part of what visitors see.

When construction began, CLT was still relatively new locally, and our team was also involved in the temporary bracing and construction sequencing.

The foundation design was challenging due to the building site’s 15-foot elevation change and the building being set directly on the property line facing the street.

Our team helped plan the temporary bracing and construction sequencing for panel installation.

Project 2: The New Lane Library and CLT Walls Chosen for Aesthetic and Practical Reasons

exterior of the new Lane Library, a mass timber library building with exposed wood roof soffits and dark metal panel cladding in Ohio

The new Lane Library branch, where a mass timber structure carries through from the interior framing to the exposed wood soffits at the roofline.

At the new Fairfield Township Lane Library, designed by Community Design Alliance, the CLT walls serve a practical purpose and were intentionally chosen for the look and feel they create in the space.

The site is a hill, and the library climbs across several levels connected by ramps, with a retaining wall behind nearly every change in grade. The exposed CLT walls serve as both bearing and accent walls, and glulam beams span up to 40 feet.

On most buildings, the CLT structure ends up hidden behind finishes. What is unique about this building is that the structure is exposed and a key part of its aesthetic design.

Visitors can see how the building is put together as they move through it.

Project 3: The Hayground School and CLT Panels to Increase Efficiency

interior of the Hayground School Arts and Science Center under construction in Bridgehampton, New York, with CLT ceiling panels and wrapped timber beams on steel connectors

Prefabricated CLT panels helped the Hayground School project team keep on site time short, which was one of their main goals.

The new Arts & Science Center for the Hayground School in Bridgehampton, New York, adds to the school’s existing campus of nearly 13 acres, which already includes several additions such as a gymnasium, a two story schoolhouse, and a cafeteria.

The project team, including John Barrows of P3 Builder Group, wanted a structure that would look good, go up quickly, and make efficient use of time on site. That led to a combination of two panelized systems: a hybrid SIPs system and CLT panels.

The builder already had experience with both prefabricated systems, and Barrows serves on the board of directors for the Structural Insulated Panel Association.

The structure includes CLT panels along with CLT beams and skylights.

The building is bi level, and like the Lane Library, it works with the grade instead of against it.

Cross Laminated Timber Frequently Asked Questions


What is cross-laminated timber used for?

Cross-laminated timber is used for floors, roofs, and walls in commercial, residential, and multifamily buildings. The panels are made from layers of lumber glued at right angles, and, according to the American Wood Council, mass timber panels such as CLT typically range from 5 to 12 inches thick. On our projects alone, CLT has served as an exposed floor and roof system, as bearing walls that double as interior finishes, and as part of a hybrid wall and roof system alongside SIPs.

What are the benefits of cross-laminated timber?

For a lot of our project, one of the biggest benefits of CLT is that it can do two jobs at once. At the Lane Library, exposed CLT walls serve as both bearing walls and interior finishes, and at the FotoFocus Center, the CLT floor and roof panels are left fully exposed throughout the building. Because the panels are prefabricated, CLT can also shorten construction schedules.

The American Wood Council noted that one design firm cut five months from a project’s total duration by using mass timber, finishing in about three-quarters of the time it would take a traditional concrete structure.

​Is CLT more expensive than steel or concrete?

The cost efficiency depends on each project’s specific requirements. According to WoodWorks, comparing the price of a mass timber frame directly to a steel or concrete frame won’t provide an accurate picture of the total project cost. Mass timber can shorten construction schedules, and because it’s a custom prefabricated system, costs can be optimized when designers and builders coordinate closely from the start.

When should a structural engineer get involved on a CLT project?

Structural engineers should be involved as early as possible and ideally during the design process. CLT panels are prefabricated and designed before they ever reach the site. Design and structural layout decisions can be locked in sooner than with conventional framing.

About Pinnacle Engineering

Pinnacle Engineering’s wide-ranging expertise and commitment to challenging the norm in structural engineering set us apart. Our clients have been coming back since 1996 for a reason.
Our engineers specialize in commercial, custom residential, and specialized design projects.

If you’re interested in working with us, reach out here.
​

Leave a Reply